How to install and debug electric hoist?

The author:liaonggong Add time:2022-08-26 16:03:39Click on:163

First of all, check whether the host, operating mechanism, control appliances (cable, buckle box, wiring frame) of electric hoist is complete, installation environment (mine, chemical plant, pharmaceutical factory, port, gas pipeline, tunnel), track model match.


Secondly, on the ground will be explosion-proof electric hoist host installed on the main beam, fine adjustment, pay attention to the equipment flange inside and single beam rail flange spacing in line with the technical requirements (see the manual), power line, sliding line, support installation to specification.


Then, the electrical control box, sliding line, cable, etc. according to the requirements of the electric hoist wire rope technical instructions.


In addition, remember to conduct a test run after the installation to test whether the ascending, descending, left and right operation is normal.


Debugging of explosion-proof electric hoist:


In the process of test, wire rope electric hoist must be in accordance with the requirements of special equipment safety technical regulations for empty load, static load, dynamic load test.


Electric hoist explosion-proof mark for Dⅱ BT4, Dⅱ CT4, suitable for grade ⅱA, ⅱB, ⅱC, T4 group temperature respectively T1& mdash; A place where combustible gases, vapors and air of T4 form explosive gas mixtures.


Explosion-proof electric hoist in the process of operation, no cable-stayed cable, no overload, no hanging, no standing under the machine.


The above is four explosion-proof electric hoist how to install and debug some of the content, you can understand, what problems and needs, you can directly leave a message on the website your contact information, we will contact you in a timely manner!